Create And Update An Unresourced Project Using Elecosoft Asta Powerproject Versi - Paul E Harris

CN¥349.00
+ CN¥101.99 送货

Create And Update An Unresourced Project Using Elecosoft Asta Powerproject Versi - Paul E Harris

由……售出:

CN¥349.00

有货
+ CN¥101.99 送货

14天退货政策

付款方式:


产品详情

产品详情

Create And Update An Unresourced Project Using Elecosoft Asta Powerproject Versi - Paul E Harris

All Scheduling Software Is Difficult To Learn For A Number Of Reasons. None Have The Optimal Settings When Installed And Templates, Views And Default Options Need To Be Adjusted To Obtain The Best Possible Performance. Usually The Help Files Do Not Connect The User To Real Life Situations And Do Not Explain The Practical Use Of Functions.
  • 品牌: Hyde Park Solutions
  • 类别: 参考
  • 语言: English
  • 作者: Paul E Harris
  • 出版日期: 2024-02-20
  • 页数: 218
  • 出版社/标签: Hyde Park Solutions
  • 格式: Paperback
  • Fruugo ID: 520369437-1059150594
  • ISBN: 9780648635529
配送

送货

在 24 小时内发货

  • STANDARD: CN¥101.99 - 之间的交付 周二 10 十一月 2026–周一 16 十一月 2026

从 英国 送货。

退货

退货

我们会争取将您订购的产品按照您的规格完整地配送给您。不过,万一您收到不完整的订单,或收到的产品与您订购的不同,或者有其他原因让您对订单不满意,您可以要求全部或部分退货,您将收到相应产品的全额退款。

查看完整的退货政策